Location: Home > SOLUTION

High-Consistency Cleaning Systems for Quality Corrugated Medium Production

2026-07-17 10:18:18

Leizhan corrugated paper making equipment

High-Consistency Cleaning Systems for Quality Corrugated Medium Production

Corrugated medium and testliner produced from recycled fiber face two primary challenges: maintaining strength properties from lower-quality furnish and managing the high contaminant load typical of mixed waste paper. High-consistency (HC) cleaning at 3-4.5% consistency before screening significantly reduces downstream equipment wear while improving overall fiber recovery rates.

Technical Specifications: Leizhan Recycled Fiber Processing Line

  • High-Consistency Cleaner: Operating consistency 3-4.5%, pressure drop 1.0-1.8 bar, heavy contaminant removal >95%, accepts loss <3%
  • Coarse Screen: 2.0-3.0mm holes, consistency 2.5-3.5%, rotor speed 1,200-1,500 rpm, rejects 10-18%
  • Fractionator Screen: 0.30-0.50mm slots, separates long and short fiber fractions, accepts 55-70% long fiber
  • Fine Screen: 0.15-0.25mm slots, consistency 1.2-1.8%, sticky removal 85-92%
  • Double Disc Refiner: 660-910mm diameter, 250-700 kW, specific energy 40-80 kWh/t depending on freeness target
  • Disc Thickener: 250-400 TPD, outlet 10-14%, filtrate suspended solids <300 ppm

Energy Efficiency Data

Processing OCC and Mixed Waste to corrugated medium typically consumes 180-220 kWh per ton of finished paper. The HC cleaning stage, operating at 3-4.5% consistency versus conventional 0.8-1.2%, reduces pumping energy by 22-25% in the cleaning circuit alone. Leizhan Double Disc Refiner with optimized plate pattern achieves a 15-18% reduction in refining energy compared to conventional single-disc refiners at the same freeness drop.

Maintenance Recommendations

  • HC cleaner cones: Inspect lower cone section for wear every 3 months; replace when wall thickness reduced by 1.5mm or more
  • Screen baskets: Coarse screen (2-3mm holes) service life 18-24 months; fine screen (0.15-0.25mm slots) 10-14 months
  • Fractionator rotor: Foil clearance check every 6 months; adjust to 0.5-0.8mm gap
  • Refiner plates: Track kWh/ton trend; replace when energy increases 20% above baseline for same freeness target

For technical consultation and equipment quotation, contact our engineering team.

Email: leizhanzhang@gmail.com


Warning: Invalid argument supplied for foreach() in /www/wwwroot/pulprefining.com/wp-includes/script-loader.php on line 2740